These photographs were taken on the 7th November 2005.
They have finished the roadways and started adding the finishing touches.
Los Soles now has a tv aerial. Work is still going on in the inside of the buildings.
They are still finishing off bits and pieces but they are nearly finished now.
The workmen were putting in some wiring outside but the good news is that furniture has been delivered to many of them. A lady who is signing on Saturday was adding the finishing touches to her property.
I couldn't get on to this complex as they were building the road, and working on the outside. The builders outside posed for me though.
The properties are currently being fittted out with kitchens etc. One I looked at was almost completed, the other was awaiting a kitchen and banister. The garden areas have been planted up.
We have been up to look around the Los Bahia today, 8th July. Since the photographs were taken last week the work has progressed very well and the new reception in nearly completed. The building work is well away from the hotel area and we see no reason why your holidays should be unduly affected by the work. The photos above show reception and the fact that they are planting trees shows that the work around the reception is nearly complete.
The other two picture were taken on 5th August. These are the last we are taking. The work going on is tidying up and finishing off new facilities. There is no real reason not to enjoy you holidays.
El Sultan 05-08 2005
Three photographs taken on the 25th July 2005.
The main thing to note is that the pipework for the buildings is going in.
The above photograph was taken on 8th July, and shows that the external stairs are being fitted.
Photographs taken on the 15th June 2005.
July 4th. There doesn't seem to be a great deal of change over the last couple of weeks.
These photographs were taken in early June 2005.
These photographs were taken on the 25th July 2005.
There is extensive work going on to complete these properties. The steps are being concreted, external lights fixed and there is lots of work now on the interiors.
The bottom photo was taken on the 14th June. It shows the last external wall being painted.
The exterior lights have now been wired up.
These photographs were taken on the 25th July 2005.
The external fence is now down, They are tarmacing the roads and are working on the swimming pool.
These photographs were taken in June 2005.
© Copyrights 2022 sunnyfuerteventura.com